This is a large quay with 11 berths situated 2 km west of Ingeniero White. Berths on the eastern side are all open ; the inner berths 7 to 11 are of no consequence.
Of the outer berths :
N6 and N5: the first is 120 m length and 249 m. the other. It is operated by Bahia Blanca port authority. The loading rates are 130/150 mt per hour basis bulk fertilizers. The over all length of pier is 249 mts, maximum LOA 230 mt. Draft alongside berth is 29SSW at 0 level.
Oleaginosa Moreno Hnos S.A. Pier 2/3: It has a storage capacity of 100,000 mt for by products. And 35,000 cbm for vegoils . The loading rate is 450 mt per hour for vegoils and 650 mt per hour for grain and by products. The over all length of piers is 270 mts and the maximum LOA permitted is 230 mt. The draft alongside berths is 34SSW at 0 level.
Flammable Terminal : It is owned and operated by Bahia Blanca port authority. It has a storage capacity of 85,000 cbm Esso and 14,000 cbm Shell, 30,000 cbm TGS, 5,000 cbm grupo Solvay, 30,000 cbm grupo Dow, 15,000 cbm Induclor, 138,000 cbm EG3. Over all length of piers : pier N1 371 mts and pier N 2 371 mts. The draft alongside berth is 42SSW at 0 level.

Home Back E-mail