Priority to load vegetable oils, therefore vessels that berth alongside pier must accept in her second off a M/Tank, except if the sum of both beams exceed 50 meters. This pier is an open one and it is usually used to load pellets, wood chips load pellets, wood chips and grain (this one exceptionally) by conveyor belt, and to unload fertilizer.

Home Back E-mail