The Central Dock is about 2.500 m long of which approximately 1,560 meters of berth are used by YPF S.A. for the DPP and CPP operations , where there are 7 operative intakes.
On the East Coast (Berisso) there are four intakes : Nš 1,2,4 and 5. On this side there is a non operative place (formerly intake Nš 3) that was used to make service or repair operations to the formerly YPF vessels.
On the West Coast (Ensenada) there are three intakes : Nš 6, 7 and 8 which are being used for the above mentioned operations, besides intakes Nš 6 and 7 are used for chemical operations.
All intakes have lines for the operations of ballast discharging. Ballast and slop are treated in special pools.
The port has 220 m approximately which is suitable for general cargoes. This berth is known as Berth 9, on the West Coast.
Copetro S.A. (petcoke plant) occupies approximately 400 m of berth on the same coast.